How to lay a concrete floor screed on the ground

When carrying out renovation work in a country house, owners often have to rearrange the floors. The situation is aggravated by the fact that the floors in the house can be made on the ground. Then preparing the screed is quite problematic. But without this, it will not be possible to provide a truly warm, reliable and beautiful floor. What will the owners have to do?

1. Preparatory activities

The excavation should be prepared, that is, about 25 cm of soil should be removed, and then its bottom and walls should be compacted. They must be dense enough so that the surface does not deform in the presence of pressure in the future. Next, a pillow of crushed stone and sand falls asleep. The total thickness should be about 10-15 cm. First, crushed stone is filled in, fine sand is placed on it. It is poured with water and also carefully tamped.

2. Waterproofing of the floor on the ground

Waterproofing work will be required to protect against flooding. You can use classic waterproofing materials, for example, roofing material. But it is much better to choose rubber-bitumen mastic or the so-called liquid waterproofing. These formulations are very easy to apply in a continuous layer, which does not leave any seams or cracks. The material is used not only for floors, but also for walls. The result should be a solid waterproofing "bowl".

3. Filling the floor screed

Next, a layer of concrete is poured. It is necessary to prepare a sufficient volume of cement-sand mortar to pour the floor screed immediately over the entire area of the room. In this case, it is already raised above ground level, about 2-3 cm. This is necessary so that the floors certainly do not freeze too much. This screed dries for a long time. For uniform drying, the solution will have to be slightly moistened from above about every 3 days. The screed will dry completely in at least 3 weeks.

4. Further finishing work

To keep the floors warm on the ground, it is important to use suitable finishing materials. For example, wooden floor coverings have a good level of insulation. You can use cork tiles, thick linoleum, laminate. Although it is much better if the screed is initially laid with an additional thermal insulation layer, for example, made of extruded polystyrene foam. But such jobs are noticeably more difficult than those described.

In principle, it is possible to provide screed and floors on the ground on your own. The owner only needs to consider everything listed here. New players often ask how to get the most out of their first deposit, and the answer is simple: use the right promo code. On Melbet, during the sign-up process, you'll find a field for entering a promotional code. Take advantage of this by choosing to use melbet promo code registration india which activates a 130% welcome bonus up to $130 for sports betting. This means whatever you deposit, you'll have extra funds to wager on your preferred sports and events. The bonus comes with standard wagering requirements: a 5x playthrough on accumulator bets with at least three selections at odds of 1.4 or higher, within 30 days.